ELECTRICAL CONTRACTOR
ELECTRICAL BUILDING WIRING
ELECTRICAL SERVICING
ELECTRICAL TROUBLESHOOTING
ELECTRICAL AS-BUILT PLAN
ELECTRICAL DESIGN
ELECTRICAL BILL OF QUANTITY ESTIMATE
ELECTRICAL PREVENTIVE MAINTENANCE
ELECTRICAL INSULATION TESTING
ELECTRICAL FEEDERLINE INSTALLATION
LIGHTNING ARRESTER INSTALLATION
KILOWATTMETER INSTALLATION
ELECTRICAL GROUNDING SYSTEM
ELECTRICAL AUDIT
PANELBOARD TRACING
MOTOR/PUMP TROUBLESHOOTING
We are capable to offer you the following services:
ELECTRICAL SERVICES
1. Complete Electrical roughing-in, piping, wiring for residential and commercial units.
2. Feederline installation and maintenance
3. Installation of service entrance for residential and commercial units.
4. Signages lighting supply and maintenance
5. Electrical Troubleshooting
6. Electrical Fit-out
7. Electrical warehouse wiring installation
8. Electrical Audit
9. Prepare Electrical As-Built plan or any other plans in autocad or sketchup format.
10. Electrical Preventive Maintenance
11. Conduct Electrical Insulation Testing(megger)
12. Conduct Electrical System leakage current testing.
13. Perform power system monitoring in residential and commercial establishment.
14. Conduct system grounding resistance measurement.
15. Conduct monitoring and measurement of voltage sag, surge and spike.
16. Transient voltage surge suppressor supply and installation.
17. Check and troubleshoot motor controllers.
18. Conduct electrical wiring tracing and prepare panelboard directories.
19. Check motor wiring using continuity and insulation resistance tester.
20. Conduct telephone, pabx and intercom wiring troubleshooting.
21. Installation, checking and troubleshooting of LAN cables for internet .
22. Capacitor Bank Supply and Installation
23. Generator piping and wiring installation
24. Lightning arrester supply and installation
25. Surge, tvss supply and installation
26. CCTV supply and installation
27. Solar System supply and installation
OTHER SERVICES
AIR CONDITIONING SERVICES
1. Cleaning of evaporator unit with pressurized water and air.
2. Cleaning of condenser unit with pressurized water and air.
3. Check air flow with anemometer.
4. Check noise produced from evaporator and condenser units with vibration meter and decibel meter.
5. Check amount of refrigerant in the system by superheat and subcool method.
6. Perform refrigerant leak test in the ACU system and lineset with ultrasonic leak detector
7. Check compressor electrical system by continuity and insulation resistance test and replace damage compressor if found.
8. Check electrical system of fan motor by continuity and insulation resistance test and replace damaged fan motor if found.
9. Check compressor / fan capacitor with capacitance meter and replace if found damaged.
10. Check system total static pressure with digital manometer.
11. Refrigerant recovery using refrigerant recovery machine and refrigerant recovery tank.
12. System flushing, purging and evacuation using flushing kit, nitrogen purge and vacuum pump
13. Complete installation of old and new split type and window type ACU with technical report.
No comments:
Post a Comment