Size of Capacitor for Power Factor Correction
For Motor | |
Size of Capacitor = 1/3 Hp of Motor ( 0.12x KW of Motor) | |
For Transformer | |
< 315 KVA | 5% of KVA Rating |
315 KVA to 1000 KVA | 6% of KVA Rating |
>1000 KVA | 8% of KVA Rating |
Earthing Resistance value
Earthing Resistance Value | |
Power Station | 0.5 Ω |
Sub Station Major | 1.0 Ω |
Sub Station Minor | 2.0 Ω |
Distribution Transformer | 5.0 Ω |
Transmission Line | 10 Ω |
Single Isolate Earth Pit | 5.0 Ω |
Earthing Grid | 0.5 Ω |
As per NEC Earthing Resistance should be <5.0 Ω |
Voltage Limit (As per CPWD & KEB)
Voltage Limit (As Per CPWD) | |
240V | < 5 KW |
415V | <100 KVA |
11KV | <3 MVA |
22KV | <6 MVA |
33KV | <12 MVA |
66KV | <20 MVA |
110KV | <40 MVA |
220KV | >40 MVA |
Voltage Variation
> 33 KV | (-) 12.5% to (+) 10% |
< 33 KV | (-) 9% to (+) 6% |
Low Voltage | (-) 6% to (+) 6% |
Insulation Class
Insulation | Temperature |
Class A | 105°C |
Class E | 120°C |
Class B | 130°C |
Class F | 155°C |
Class H | 180°C |
Class N | 200°C |
Standard Voltage Limit
Voltage | IEC (60038) | IEC (6100:3.6) | Indian Elect. Rule |
ELV | < 50 V | ||
LV | 50 V to 1 KV | <=1 KV | < 250 V |
MV | <= 35 KV | 250 V to 650 V | |
HV | > 1KV | <= 230 KV | 650 V to 33 KV |
EHV | > 230 KV | > 33 KV |
Standard Electrical Connection (As per GERC)
As per Type of Connection | |
Connection | Voltage |
LT Connection | <=440V |
HT connection | 440V to 66KV |
EHT connection | >= 66KV |
As per Electrical Load Demand | |
Up 6W Load demand | 1 Phase 230V Supply |
6W to 100KVA(100KW) | 3 Phase 440V Supply |
100KVA to 2500KVA | 11KV,22KV,33KV |
Above 2500KVA | 66KV |
HT Connection Earthing | |
H.T Connection’s Earthing Strip | 20mmX4mm Cu. Strip |
CT & PT bodies | 2Nos |
PT Secondary | 1Nos |
CT Secondary | 1Nos |
I/C and O/G Cable+ Cubicle Body | 2Nos |
Standard Meter Room Size (As per GERC)
Meter Box Height | Upper level does not beyond 1.7 meter and Lower level should not below 1.2 meter from ground. |
Facing of Meter Box | Meter Box should be at front area of Building at Ground Floor. |
Meter Room / Closed Shade | 4 meter square Size |
Electrical Load as per Sq.ft Area (As per DHBVN)
Sq.ft Area | Required Load (Connected) |
< 900 Sq.ft | 8 KW |
901 Sq.ft to 1600 Sq.ft | 16 KW |
1601 Sq.ft to 2500 Sq.ft | 20 KW |
> 2500 Sq.ft | 24 KW |
For Flats :100 Sq.ft / 1 KW | |
For Flats USS /TC: 100 Sq.ft / 23 KVA |
Contracted Load in case of High-rise Building
For Domestic Load | 500 watt per 100 Sq. foot of the constructed area. |
For Commercial | 1500 watt per 100 Sq. foot of the constructed area |
Other Common Load | For lift, water lifting pump, streetlight if any, corridor/campus lighting and other common facilities, actual load shall be calculated |
Staircase Light | 11KW/Flat Ex: 200Flat=200×11=2.2KW |
Sanctioned Load for Building | |
Up to 50 kW | The L.T. existing mains shall be strengthened. |
50 kW to 450 kW (500 kVA) | 11 kV existing feeders shall be extended if spare capacity is available otherwise, new 11 kV feeders shall be constructed. |
450 kW to 2550 kW (3000 kVA) | 11 kV feeder shall be constructed from the nearest 33 kV or 110 kV substation |
2550 kW to 8500 kW (10,000 kVA) | 33kV feeder from 33 kV or 110 kV sub station |
8500 kW (10,000 kVA) | 110 kV feeder from nearest 110 kV or 220 kV sub-station |