Introduction to GIS (Gas Insulated Switchgear)
Medium voltage (5-38 kV) gas insulated switchgear (GIS) differs greatly from the medium voltage AIS – Air insulated switchgear commonly used in North America Instead of using air and solid insulation materials, GIS switchgear has the vacuum interrupter and bare bus conductors in a sealed housing filled with an insulating gas.
1. Environmental Concerns
The insulating gas used in MV GIS switchgear, sulfur hexafluoride (SF6), is a highly potent greenhouse gas with a global warming potential 23,900 times greater than CO2. SF6 also has an atmospheric life of 3,200 years, so it will contribute to global warming for a very long time.
One pound of SF6 has the global warming equivalent of 11 tons of CO2.
(Source: EPA website www.epa.gov/electricpower-sf6)
2. Safety Concerns
In its normal state, SF6 gas is:
- Colorless,
- Odorless,
- Non-flammable, and
- Non-toxic to humans.
However, under high temperature conditions (> 350 degrees F), SF6 decomposes into products that are toxic and corrosive. Decomposition by-products can occur when SF6 is exposed to spark discharges, partial discharges, switching arcs and failure arcing.
These byproducts, in the form of gases or powders, can cause the following conditions in humans:
- irritation to the eyes, nose, and throat,
- pulmonary edema and
- other lung damage, skin and eye burns, nasal congestion, bronchitis;
- powders may cause rashes.
(Source: EPA website www.epa.gov/electricpower-sf6)
ANSI certification results in equipment that meets rigorous U.S. operating requirements. GIS equipment is not tested to these standards, and definitely is not tested to IEEE guide for testing metal-enclosed switchgear for internal arcing faults.IEC 62271-200 – Metal enclosed MV switchgear, accepts internal arc tests to be performed with air instead of SF6, for environmental reasons.
However, it should be noted that the test results may differ if the tests were done with SF6.
When a dielectric failure occurs in a GIS, the arc generally will not be extinguished by the SF6, and could lead to internal pressure build up and cause holes in metal walls due to concentrated buming of the arc. GIS manufacturers just state that the GIS equipment is “inherently” arc resistant, but in reality an arc can very well live within the GIS.
Also it is well known that all SF6 containments leak, therefore, the chances of having an issue with GIS is more prevalent than ever having an arc issue within non arc resistant switchgear.
Utilizing other solutions, such as designs that use complete single pole solid insulation, partial discharge sensors for insulation diagnostics, and remote racking for safety, the non arc resistant solution easily exceeds the safety of GIS.
3. Special Handling Procedures
Due to the safety concems, special handling procedures are recommended for heavily arced SF6 including the use of personal protective equipment (PPE – i.e., respiratory device, protective clothing such as rubber gloves, footwear, goggles) for removal/handling of solid SF6 byproducts.
Contaminated SF6 gas must either be filtered on-site using special mobile equipment orremoved for off-site filtering or destruction using trained personnel.
(Source: EPA website www.epagovlelectricpower-sf6)
4. Installation Concerns
The most significant installation issues involve the need for proper alignment. The foundation must be level and in a single plane to allow for proper assembly of the shipping sections. The foundation height can only vary by 1 mm per meter, with a maximum deviation of 2 mm over the full length of the assembly.
After installation of the GIS shipping groups, equipment must be sealed and SF6 is filled at site.
To maintain dielectric withstand levels, special cable termination is required in GIS. The design also limits number of cables/phase that can be installed in a given circuit.
Another issue is power cable connections are not accessible without disassembling the switchgear.
(Source: IEEE Transaction on Industry Applications, Vol. 40. No. 5, September! October 2004 and Eaton experience.)
5. Operation and Maintenance Concerns
Because SF6 gas provides insulation of internal components, draw out circuit breaker designs are not possible. Most local codes require that the design of equipment incorporate a means to visually verify the isolating function of disconnect devices.
In the GIS switchgear, this requires a means to visually verify the position of the three-position switch. To meet this requirement, some manufacturers install miniature video cameras, and associated lighting, both mounted external to the SF6 gas enclosure.
The video leads are brought to the front panel of the switchgear, and a monitoring device is provided to view the position of the switch.
Cant see this video? Click here to watch it on Youtube.
(Source: IEEE Transaction on Industry Applications, Vol. 40, No. 5, September I October 2004)
6. End of Life and Recycling Concerns
Used SF6 gas must be recovered by trained professionals, then stored and transported in US Department of Transportation (DOT) approved cylinders for the final recycle process. DOT regulations require equipment containing SF6 gas at pressures greater than 25 psig at 68° Fto be certified to transport compressed gas.
DOT regulations require cylinders of SF6 gas with a gross weight greater than 220 lbs. It must include a shipping paper. Recyclers equipped to handle metals exposed to SF6 gas should process the remaining metal parts of the switchgear.
(Source: EPRI Guidelines for Safe Handling of SF6, DOT CFR 49 Chapter l Subchapter C)
GIS differs greatly from traditional MV Metal Clad switchgear widely used in North America. A view of one pole of a typical unit of GIS switchgear is shown in Figure 1.
1 – Cast aluminium housing
2 – Main bus bars with sliding supports
3 – Three-position selector switch
4 – Gas tight bushing
5 – Vacuum interrupter
6 – Toroidal current transformer
7 – Capacitive voltage transformer
8 – Shock-proof (safe-to-touch) cable termination (not shown)
2 – Main bus bars with sliding supports
3 – Three-position selector switch
4 – Gas tight bushing
5 – Vacuum interrupter
6 – Toroidal current transformer
7 – Capacitive voltage transformer
8 – Shock-proof (safe-to-touch) cable termination (not shown)
As in air insulated Metal Clad switchgear, vacuum circuit breakers are used for interruption.
MV GIS switchgear differs from high-voltage GIS switchgear in that the SF6 gas is used for its insulating properties, not for interruption.
Conventional MC switchgear relies on a combination of air and solid insulating materials, but GIS switchgear uses bare bus conductors on insulating supports, immersed in insulating gas.
Conclusion
Due to the environmental concerns, installing medium-voltage GIS switchgear is not consistent with the Sustainability Principles and Greenhouse Gas reduction goals of many leading edge corporations and institutions.
The safety and special handling concems could raise issues with internal Environmental Health and Safety policies.
Finally, the installation, operation and maintenance and end of life/recycling concerns associated with medium voltage GIS switchgear can raise the total cost of ownership and may not be the best value solution.
Alternative solutions include AIS – air insulated switchgear and solid insulated switchgear designs that avoid the use of SF6 gas and can offer a lower total cost of ownership over the complete life cycle of your medium voltage equipment.
Resource: EATON CORPORATION
for your philippine electrical concerns...needs...installation...orders...safeelectrical2013@gmail.com
METRO MANILA PHILIPPINES
WIRE AND CABLE SUPPLIER IN METRO MANILA
WIRE AND CABLE SUPPLIER IN QUEZON CITY
ELECTRICAL WIRE AND CABLE SUPPLIER IN MAKATI PHILIPPINES
ELECTRICAL WIRE AND CABLE SUPPLIER IN TAGUIG PHILIPPINES
ELECTRICAL WIRE AND CABLE SUPPLIER IN MAKATI PHILIPPINES
ELECTRICAL WIRE AND CABLE SUPPLIER IN GLOBAL CITY PHILIPPINES
ELECTRICAL WIRE AND CABLE SUPPLIER IN MAKATI PHILIPPINES
ELECTRICAL WIRE AND CABLE SUPPLIER IN TAGUIG PHILIPPINES
ELECTRICAL WIRE AND CABLE SUPPLIER IN ALABANG PHILIPPINES
ELECTRICAL WIRE AND CABLE SUPPLIER IN GLOBAL CITY PHILIPPINES
MOTOR AVR UPS INVERTER TRANSFORMER SUPPLIER IN METRO MANILA
MOTOR AVR UPS INVERTER TRANSFORMER IN QUEZON CITY
MOTOR AVR UPS INVERTER TRANSFORMER SUPPLIER IN MAKATI PHILIPPINES
MOTOR AVR UPS INVERTER TRANSFORMER SUPPLIER IN TAGUIG PHILIPPINES
MOTOR AVR UPS INVERTER TRANSFORMER SUPPLIER IN MAKATI PHILIPPINES
MOTOR AVR UPS INVERTER TRANSFORMER SUPPLIER IN GLOBAL CITY PHILIPPINES
MOTOR AVR UPS INVERTER TRANSFORMER SUPPLIER IN MAKATI PHILIPPINES
MOTOR AVR UPS INVERTER TRANSFORMER SUPPLIER IN TAGUIG PHILIPPINES
MOTOR AVR UPS INVERTER TRANSFORMER SUPPLIER IN ALABANG PHILIPPINES
MOTOR AVR UPS INVERTER TRANSFORMER SUPPLIER IN GLOBAL CITY PHILIPPINES
WIRE AND CABLE SUPPLIER IN LUZON
WIRE AND CABLE SUPPLIER IN VISAYA
WIRE AND CABLE SUPPLIER IN SUBIC
WIRE AND CABLE SUPPLIER IN CLARK
WIRE AND CABLE SUPPLIER IN THE PHILIPPINES
WIRE AND CABLE SUPPLIER IN THE PHILIPPINES
ELECTRICAL SUPPLIER IN METRO MANILA
ELECTRICAL SUPPLIER IN QUEZON CITY
ELECTRICAL SUPPLIER IN LUZON
ELECTRICAL SUPPLIER IN VISAYA
ELECTRICAL SUPPLIER IN SUBIC
ELECTRICAL SUPPLIER IN CLARK
ELECTRICAL SUPPLIER IN PHILIPPINE INDUSTRIAL PARK
ELECTRICAL SUPPLIER IN PHILIPPINE ECONOMIC ZONE
ELECTRICAL SUPPLIER FOR PHILIPPINE FOREIGNERS
ELECTRICAL SUPPLIER FOR PHILIPPINE PROVINCES
ELECTRICAL SUPPLIER IN PHILIPPINES BATANES
ELECTRICAL SUPPLIER IN PHILIPPINES LAOAG
ELECTRICAL SUPPLIER IN PHILIPPINES CLARK
ELECTRICAL SUPPLIER IN PHILIPPINES SUBIC
ELECTRICAL SUPPLIER IN PHILIPPINES MANILA
ELECTRICAL SUPPLIER IN PHILIPPINES BATANGAS
ELECTRICAL SUPPLIER IN PHILIPPINES LEGASPI
ELECTRICAL SUPPLIER IN PHILIPPINES BORACAY
ELECTRICAL SUPPLIER IN PHILIPPINES PALAWAN
ELECTRICAL SUPPLIER IN PHILIPPINES PUERTO PRINCESA
ELECTRICAL SUPPLIER IN PHILIPPINES ILOILO
ELECTRICAL SUPPLIER IN PHILIPPINES BICOL
ELECTRICAL SUPPLIER IN PHILIPPINES CEBU
ELECTRICAL SUPPLIER IN PHILIPPINES BOHOL
ELECTRICAL SUPPLIER IN PHILIPPINES SURIGAO
ELECTRICAL SUPPLIER IN PHILIPPINES DUMAGUETE
ELECTRICAL SUPPLIER IN PHILIPPINES BACOLOD
ELECTRICAL SUPPLIER IN PHILIPPINES CAGAYAN DE ORO
ELECTRICAL SUPPLIER IN PHILIPPINES SURIGAO
ELECTRICAL SUPPLIER IN PHILIPPINES BUKIDNON
ELECTRICAL SUPPLIER IN PHILIPPINES ILIGAN
ELECTRICAL SUPPLIER IN PHILIPPINES ZAMBOANGA
ELECTRICAL SUPPLIER IN PHILIPPINES BUTUAN
ELECTRICAL SUPPLIER IN PHILIPPINES GENERAL SANTOS
ELECTRICAL SUPPLIER IN PHILIPPINES ZAMBOANGA
ELECTRICAL SUPPLIER IN PHILIPPINES DAVAO
ELECTRICAL SUPPLIER IN PHILIPPINES CAGAYAN DE ORO
ELECTRICAL SUPPLIER IN PHILIPPINES CAGAYAN DE ORO
ELECTRICAL SUPPLIER IN PHILIPPINES BINONDO
ELECTRICAL SUPPLIER IN PHILIPPINES BINONDO
ELECTRICAL SUPPLIER IN MAKATI PHILIPPINES
ELECTRICAL SUPPLIER IN MAKATI PHILIPPINES
ELECTRICAL SUPPLIER IN TAGUIG PHILIPPINES
ELECTRICAL SUPPLIER IN TAGUIG PHILIPPINES
ELECTRICAL SUPPLIER IN METRO MANILA PHILIPPINES
ELECTRICAL SUPPLIER IN METRO MANILA PHILIPPINES
ELECTRICAL SUPPLIER IN MANILA PHILIPPINES
ELECTRICAL SUPPLIER IN MANILA PHILIPPINES
ELECTRICAL SUPPLIER IN NOVALICHES QUEZON CITY PHILIPPINES
ELECTRICAL SUPPLIER IN NOVALICHES QUEZON CITY PHILIPPINES
ELECTRICAL SUPPLIER IN SAN JOSE DEL MONTE BULACAN PHILIPPINES
ELECTRICAL SUPPLIER IN SAN JOSE DEL MONTE BULACAN PHILIPPINES
FOR YOUR PHILIPPINE ELECTRICAL CONCERNS...NEEDS...INSTALLATION...QUOTATION...ORDERS
KINDLY EMAIL US: SAFEELECTRICAL2013@GMAIL.COM
SAFEELECTRICALONLINE@GMAIL.COM
FOR YOUR PHILIPPINE ELECTRICAL CONCERNS...NEEDS...INSTALLATION...QUOTATION...ORDERS:
KINDLY EMAIL US: SAFEELECTRICAL2013@GMAIL.COM
SAFEELECTRICALONLINE@GMAIL.COM
FOR PHILIPPINE INQUIRIES LIKE LIGHTNING ARRESTER SUPPLY AND INSTALLATION
CONTACT US:
FOR PHILIPPINE INQUIRIES LIKE LIGHTNING ARRESTER SUPPLY AND INSTALLATION
CONTACT US:
FOR PHILIPPINE INQUIRIES LIKE LIGHTNING ARRESTER SUPPLY AND INSTALLATION
CONTACT US:
MOBILE NUMBERS: SMART: +63 09079522099
+63 09214026477
GLOBE: +63 09273919600
+63 09157920129
SUN: +63 9227192434
+63 09336253505
WIRELESS LANDLINE: +63 4068727
+63 4922566
LANDLINE: +63 4317553
HURRY..CALL US...NOW!!!!
THANK YOU FOR YOUR ORDERS AND INQUIRIES...
LIGHTNING ARRESTER SUPPLIER AND INSTALLER IN THE PHILIPPINES
ELECTRICAL FENCE SUPPLIER AND INSTALLER IN THE PHILIPPINES
LIGHTNING ARRESTER SUPPLIER AND INSTALLER IN METRO MANILA
ELECTRICAL FENCE SUPPLIER AND INSTALLER IN METRO MANILA
LIGHTNING ARRESTER SUPPLIER AND INSTALLER IN THE PHILIPPINE ECONOMIC ZONE
ELECTRICAL FENCE SUPPLIER AND INSTALLER IN THE PHILIPPINE ECONOMIC ZONE
LIGHTNING ARRESTER SUPPLIER AND INSTALLER IN THE VISAYA REGION
ELECTRICAL FENCE SUPPLIER AND INSTALLER IN THE VISAYAS REGION
LIGHTNING ARRESTER SUPPLIER AND INSTALLER IN THE MINDANAO
ELECTRICAL FENCE SUPPLIER AND INSTALLER IN THE MINDANAO
FOR YOUR LIGHTNING STRIKE PROTECTION...LET US HELP YOU AVOID SUCH ACCIDENTS...
BEFORE IT IS TOO LATE...BEFORE IT IS TOO LATE...
WHEN LIGHTNING STRIKE HIT YOU..
I GUARANTEE YOU..YOU'LL NEVER LIVE TO TELL YOUR EXPERIENCE...
DON'T BE THE NEXT VICTIM...PROTECT YOURSELF..YOUR FAMILY..YOUR BUSINESS AT ALL TIMES..
INSTALL A LIGHTNING ARRESTER IN YOUR PLACE...DO IT NOW BEFORE YOUR CAUGHT UNAWARE...
IF YOU HAVE LIGHTING PROTECTION INSTALLED...
YOU'LL HAVE PEACE OF MIND...YOU CAN SLEEP WELL EVEN WHEN LIGHTNING STRIKES...
YOU KNOW YOUR WELL PROTECTED...
IN YOUR HOME, IN YOUR PLACE OF BUSINESS AND IN YOUR PROPERTIES...
HURRY..CALL US...NOW!!!!
THANK YOU FOR YOUR ADVANCE ORDERS AND INQUIRIES...
"PHILIPPINE FOREIGNERS AND PHILIPPINE PROVINCES ELECTRICAL SUPPLIER
AND SERVICE PROVIDER"
"SAFE ELECTRICAL SUPPLY AND SERVICES"
"SAFE ELECTRICAL SUPPLY AND SERVICES"
"SAFE ELECTRICAL SUPPLY AND SERVICES"
"SAFE ELECTRICAL SUPPLY AND SERVICES"
Jigz Enerio - Sales/Project Coordinator
Safe Electrical Supply and Services
Registered Master Electrician PRC#00034433
Real Estate Broker PRC#0000838
Institute of Integrated Electrical Engineers(IIEE)Membership#19420
Telephone: 4068727 4922566
Telefax: 4178583 4317553
smart: 09079522099
globe: 09273919600
sun: 09227192434
Building K-415 Smilecitihomes 1 Barangay Kaligayahan
Novaliches Quezon City 1124
YAHOO MESSENGER: SAFEELECTRICALSUPPLYANDSERVICES@YAHOO.COM
SAFEELECTRICALSUPPLYANDSERVICES
WEBSITE: WWW.SAFEELECTRICALSUPPLYANDSERVICES.BLOGSPOT.COM
WEBSITE: WWW.SAFEELECTRICALSUPPLYANDSERVICES.BLOGSPOT.COM
WEBSITE: WWW.SAFEELECTRICALSUPPLYANDSERVICES.BLOGSPOT.COM
WEBSITE: WWW.SAFEELECTRICALSUPPLYANDSERVICES.BLOGSPOT.COM
"The Elevator to Success is always out of order,
but one can always use the stairs"
"One does not Lead by hitting people over the Head,
that's assault not Leadership" - Eisenhower
"If You Think Education is Expensive,
count the cost of being ignorant" - Past Harvard President
"If you're gonna be thinking anyway,
you might as well think big" - Donald Trump
"Insanity, doing the same things
over and over again,
then expecting a different result" - Albert Einstein
"Small minds talk of people,
average minds talk of events,
great minds talk of ideas"
“I shall pass this way but once; any good that I can do
or any kindness I can show to any human being;
let me do it now. Let me not defer nor neglect it,
for I shall not pass this way again.”
Etienne de Grellet (1773-1855);
Quaker missionary
If you wanna make the world a better place
take a look at yourself and make a change
- Michael Jackson
"The Best things in life are FREE,
Family, Relatives, Friends, Health and most especially Time"
Our company operates in the principle of cooperation, collaboration,
joint partnership/marketing and cross promotion.
We treat our people,clients,suppliers,affiliates
subcontractors, business owners, entrepreneurs(SMALL TIME or Bigtime),
common people,sales people especially PURCHASING OFFICERS as our business partners and friends.
We operate in the principle of Win-Win in every transactions we get involved in
and our company would like to establish good long-term relationship with the client we serve...
We value and aim for REPEAT BUSINESS...and not just for a one-time transaction...
Delivery Schedule: 9am to 10pm Monday to Friday Only
OFFICE DAYS: Monday to Friday Only
9-12PM TO 1-5PM ONLY
Saturday: Lord's day "EL SHADDAI" The God who is more than enough
Sunday: Family day
10% of what the company earns, we give to the Lord,
10% of what the company earns, we give to charity,
this is the company's way of giving back part of what it earns,
to the community and above.
"It is unwise to pay too much, but it's worst to pay too little.
When you pay too much, you lose a little money - that is all...
When you pay too little, You sometimes lose everything,
Because the thing you bought or the service you acquired
was incapable of doing the thing it was bought or intended to do.
The common law of business balance
prohibits paying a little and getting a lot - it can't be done.
If you deal with the lowest bidder,
It is well to add something for the risk you run,
And if you do that,
You will have enough to pay for something better."
- JOHN RUSKIN(1819 - 1900)
"Good things aren't cheap,
and cheap things aren't good"
HEALTH TIPS HEALTH TIPS HEALTH TIPS HEALTH TIPS HEALTH TIPS HEALTH TIPS
ATTENTION: FOR ALL INDIVIDUALS ESPECIALLY THOSE AGE 40 AND ABOVE.
MEDICAL EXPERIMENT - MIRACLES WITH WATER
Japanese Sickness Association has published the following experiment with WATER.
They Claim 100% success for curing old and new diseases as follows:
1. Headache, BP, Anaemia, Arthrosis, Paralysis, Palpitation, Epilepsy and Obesity
2. Cough, Bronchitis, Asthma, and Tuberculosis
3. Meningitis and any other diseases connected with URINE and LIVER.
4. Hyper-acidity, Gastritis, Dysentery, Constipation, Piles and Diabetes
5. Any other diseases connected with Eye, Nose and Throat.
6. Irregular menstrual periods of women
METHOD OF TREATMENT AND MAINTENANCE:
1. Wake-up early morning and drink Four(4) glasses (160ml each) in an empty stomach.
Thereafter, no solids or liquids should be taken up to 45 minutes.
2. Normal breakfast can be taken after the 45 minutes time elapsed.
3. Nothing either liquid or solid should be taken for Two(2) hours after breakfast, the same as with Lunch and Dinner.
4. After Dinner nothing should be taken before bedtime or sleep.
Sick and old people will find it difficult to drink Four(4) glasses of water at an instant in the beginning, but, can increase
gradually to the recommended level in a short time period.
Experiment has proved that the following diseases have been cured on treatment of water for the period shown against them
a) Hypertension - 30 days d) Constipation - 10 days
b) Gastric Problems - 30 days e) Cancer - 6 months
c) Diabetes - 30 days f) Tuberculosis - 3 months
Those who suffering from Arthritis should try this experiment three(3) times a day for one(1) week and thereafter reduce to
once in the morning. For first few days you may experience to pass urine more than the norma, but no side effects.
THIS WILL CLEANSED YOUR BODY OF IMPURITIES AND WILL
PREVENT MANY TYPES OF DISEASES...
EXERCISE RELIGIOUSLY...
AS THE SAYING GOES "HEALTH IS WEALTH"
REMEMBER:
70% of our body is made up of water...
only 30% of our body is solid...
HEALTH IS WEALTH...
WHAT'S THE USE OF HAVING A BILLION
BUT LYING IN A BED - SICK
OR SUFFERING FROM AN ILLNESS.....
I WOULD RATHER HAVE A CLEAN BILL OF HEALTH FOR A BILLION.
WHEN YOU REACH THE AGE OF 35 EXERCISE IS A MUST...
WATCH YOUR DIET...
EXERCISE DAILY AND RELIGIOUSLY
TAKE YOUR MULTIVITAMINS TO SUPPLEMENT YOUR FOOD INTAKE....
THE BEST THINGS IN LIFE ARE FREE.....
FAMILY....RELATIVES....FRIENDS....HEALTH and most importantly TIME....
YOU ARE MORE BLESSED THAN OTHERS...
WHEN YOU HAVE BOTH YOUR EYES SO YOU CAN CLEARLY SEE
OTHERS HAVE ONLY ONE...OTHERS ARE TOTALLY BLIND...
WHEN YOU HAVE BOTH YOUR EARS SO YOU CAN CLEARLY HEAR
OTHERS HAVE ONLY ONE...OTHERS ARE TOTALLY DEAF...
WHEN YOU HAVE BOTH YOUR HANDS SO YOU CAN HOLD THINGS WELL
OTHERS HAVE ONLY ONE...OTHERS HAVE NONE...
WHEN YOU HAVE BOTH YOUR FEET SO YOU CAN WALK EASILY
OTHERS HAVE ONE...OTHERS HAVE NONE..
WHEN YOU STILL HAVE YOUR PARENTS...
OTHERS HAVE ONE...OTHERS HAVE NONE...
WHEN YOU HAVE CHILDREN...
OTHERS HAVE ONE...OTHERS HAVE NONE...
WHEN YOU HAVE A FAMILY...
SOME HAVE NONE...OTHERS TOTALLY ORPHANED
WHEN YOU ARE LIVING IN THE PHILIPPINES...A DEMOCRATIC COUNTRY..
THE WEATHER NOT THAT EXTREMELY HOT NOR COLD..
WERE PLANTS AND TREES GROW EASILY
SURROUNDED BY SEAS FULL OF FISHES AND NATURAL RESOURCES
WHEN YOU ARE OLD AND STILL LIVING WITH YOUR CHILDREN
IN SOME COUNTRIES OLD PARENTS AND PEOPLE
ARE LEFT IN THE "HOME OF THE AGED NURSING FOUNDATION"
WHEN YOU STILL HAVE YOUR JOB...WORKING IN AN AIR-CONDITIONED
ROOM..JUST CONSIDER THE CONSTRUCTION WORKERS DOING THEIR
HARD LABOR JOBS UNDER THE HEAT OF THE SUN...IGNORING THE
DANGEROUS ELEMENTS CONFRONTING THEM....
COUNT YOUR BLESSINGS...COUNT THEM ONE BY ONE...
DON'T THINK OF SAYING ANY UNKIND WORD...
THINK OF PEOPLE WHO CAN'T SPEAK,
DON'T COMPLAIN ABOUT THE FOOD YOU EAT,
SOME HAVE NOTHING.
DON'T COMPLAIN ABOUT LIFE,
PAINT A SMILE ON YOUR FACE
AND THANK GOD YOU'RE ALIVE AND STILL AROUND
LIFE IS A GIFT......
LIVE IT WELL......
SAFETY 1ST
REPEAT BUSINESS 2ND
PRAY ALWAYS IT WORKS!!!
ATTENTION: FOREIGN ELECTRICAL MANUFACTURERS AND ELECTRICAL DISTRIBUTORS
OUR COMPANY WELCOMES ELECTRICAL FOREIGN SUPPLIER/MANUFACTURER/S
WHO WOULD LIKE TO OFFER THEIR PRODUCT LINE
HERE IN THE PHILIPPINES BUT ON A CONSIGNMENT BASIS ONLY,
MEANING PAYMENT WILL BE FOR A CERTAIN PERIOD...EXAMPLE SIX(6) MONTHS TO ONE(1) YEAR,
ALL THOSE ITEMS THAT WILL NOT BE SOLD OR SLOW MOVING ITEMS WILL BE REPLACED
AND WE WILL JUST PAY FOR THOSE SOLD ITEMS
YOUR COMPANY WILL BE SHOULDERING THE FORWARDING/FREIGHT COST
OR SHIPMENT COST...
WE WILL BE IN CHARGE OF STOCKAGE,MARKETING,SALES AND AFTER SALES CONCERNS..
CONTACT,EMAIL OR CALL US IF YOUR COMPANY IS INTERESTED WITH OUR OFFER...
BY THE WAY PAYMENT WILL BE BANK TO BANK...
YOUR BANK WILL BE COORDINATING WITH OUR LOCAL BANK HERE IN THE PHILIPPINES....
CALL/EMAIL US IF YOUR COMPANY IS INTERESTED ON OUR OFFER....
No comments:
Post a Comment