"YOUR FRIENDLY PHILIPPINE FOREIGNERS AND PHILIPPINE PROVINCES ONLINE ELECTRICAL SUPPLIER"

"YOUR FRIENDLY PHILIPPINE FOREIGNERS AND PHILIPPINE PROVINCES ONLINE ELECTRICAL SUPPLIER...AND SERVICE PROVIDER" WE'LL HELP YOU OWN YOUR ELECTRICAL SUPPLIES REQUIREMENTS

Saturday, September 14, 2013

Defining Size and Location of Capacitor in Electrical System (2)...for your philippine electrical concerns...needs...installation...orders...safeelectrical2013@gmail.com

Defining Size and Location of Capacitor in Electrical System (2)
Defining Size and Location of Capacitor in Electrical System (2)


Content

Size of CB, Fuse and Conductor of Capacitor Bank

A. Thermal and Magnetic setting of a Circuit breaker

1. Size of Circuit Breaker

1.3 to 1.5 x Capacitor Current (In) for Standard Duty/Heavy Duty/Energy Capacitors
  • 1.31×In for Heavy Duty/Energy Capacitors with 5.6% Detuned Reactor (Tuning Factor 4.3)
  • 1.19×In for Heavy Duty/Energy Capacitors with 7% Detuned Reactor (Tuning Factor 3.8)
  • 1.12×In for Heavy Duty/Energy Capacitors with 14% Detuned Reactor (Tuning Factor 2.7)
Note: Restrictions in Thermal settings of system with Detuned reactors are due to limitation of IMP (Maximum Permissible current) of the Detuned reactor.

2. Thermal Setting of Circuit Breaker

1.5x Capacitor Current (In) for Standard Duty/Heavy Duty/Energy Capacitors

3. Magnetic Setting of Circuit Breaker

5 to 10 x Capacitor Current (In) for Standard Duty/Heavy Duty/Energy Capacitors
Example: 150kvar,400v, 50Hz Capacitor
  • Us = 400V, Qs = 150kvar, Un = 400V, Qn = 150kvar
  • In = 150000/400√3 = 216A
  • Circuit Breaker Rating = 216 x 1.5 = 324A
  • Select a 400A Circuit Breaker.
  • Circuit Breaker thermal setting = 216 x 1.5 = 324 Amp
Conclusion: Select a Circuit Breaker of 400A with Thermal Setting at 324A and Magnetic Setting (Short Circuit) at 324A

B. Fuse Selection

The rating must be chosen to allow the thermal protection to be set to:
1.5 to 2.0 x Capacitor Current (In) for Standard Duty/Heavy Duty/Energy Capacitors.
  • 1.35×In for Heavy Duty/Energy Capacitors with 5.7% Detuned Reactor (Tuning Factor 4.3)
  • 1.2×In for Heavy Duty/Energy Capacitors with 7% Detuned Reactor (Tuning Factor 3.8)
  • 1.15×In for Heavy Duty/Energy Capacitors with 14% Detuned Reactor(Tuning Factor 2.7)
For Star-solidly grounded systems:
Fuse > = 135% of rated capacitor current (includes overvoltage, capacitor tolerances, and harmonics).
For Star -ungrounded systems:
Fuse > = 125% of rated capacitor current (includes overvoltage, capacitor tolerances, and harmonics).
Care should be taken when using NEMA Type T and K tin links which are rated150%. In this case, the divide the fuse rating by 1.50.
Example 1: 150kvar,400v, 50Hz Capacitor
  • Us = 400V; Qs = 150kvar, Un = 400V; Qn = 150kvar.
  • Capacitor Current =150×1000/400 =375 Amp
To determine line current, we must divide the 375 amps by √ 3
  • In (Line Current) = 375/√3 = 216A
  • HRC Fuse Rating = 216 x1.65 = 356A to
  • HRC Fuse Rating = 216 x 2.0 = 432A so Select Fuse Size 400 Amp

Problems with Fusing of Small Ungrounded Banks

Example: 12.47 kV, 1500 Kvar Capacitor bank made of three 3 No’s of 500 Kvar single-phase units.
  • Nominal Capacitor Current = 1500/1.732×12.47 = 69.44 amp
  • Size of Fuse = 1.5×69.44 = 104 Amp = 100 Amp Fuse
If a capacitor fails, we say that It may approximately take 3x line current. (3 x 69.44 A = 208.32 A).
It will take a 100 A fuse approximately 500 seconds to clear this fault (3 x 69.44 A = 208.32 A). The capacitor case will rupture long before the fuse clears the fault.
The solution is using smaller units with individual fusing. Consider 5 No’s of 100 kVAR capacitors per phase, each with a 25 A fuse. The clear time for a 25 A fuse @ 208.32 A is below the published capacitor rupture curve.

C. Size of Conductor for Capacitor Connections

Size of capacitor circuit conductors should be at least 135% of the rated capacitor current in accordance with NEC Article 460.8 (2005 Edition).

Size of capacitor for Transformer No-Load compensation

Fixed compensation

The transformer works on the principle of Mutual Induction. The transformer will consume reactive power for magnetizing purpose. Following size of capacitor bank is required to reduce reactive component (No Load Losses) of Transformer.
Selection of capacitor for transformer no-load compensation
KVA Rating of the TransformerKvar Required for compensation
Up to and including 315 KVA5% of KVA Transformer Rating
315 to 1000 KVA6% of KVA Transformer Rating
Above 1000 KVA8% of KVA Transformer Rating

Sizing of capacitor for motor compensation

The capacitor provides a local source of reactive current. With respect to inductive motor load, this reactive power is the magnetizing or “no load current“ which the motor requires to operate.
A capacitor is properly sized when its full load current rating is 90% of the no-load current of the motor. This 90% rating avoids over correction and the accompanying problems such as overvoltages.

1. If no-load current is known

The most accurate method of selecting a capacitor is to take the no load current of the motor, and multiply by 0.90 (90%).
Example:
Size a capacitor for a 100HP, 460V 3-phase motor which has a full load current of 124 amps and a no-load current of 37 amps.
Size of Capacitor = No load amps (37 Amp) X 90% = 33 Kvar

2. If the no load current is not known

If the no-load current is unknown, a reasonable estimate for 3-phase motors is to take the full load amps and multiply by 30%. Then multiply it by 90% rating figure being used to avoidovercorrection and overvoltages.
Example:
Size a capacitor for a 75HP, 460V 3-phase motor which has a full load current of 92 amps and an unknown no-load current.
No-load current of Motor = Full load Current (92 Amp) x 30% = 28 Amp estimated no-load Current.
Size of Capacitor = No load amps (28 Amp) X 90% = 25 Kvar.

Thumb Rule:

It is widely accepted to use a thumb rule that Motor compensation required in kvar is equal to 33% of the Motor Rating in HP.

Placement of Power Capacitor Bank for Motor

Capacitors installed for motor applications based on the number of motors to have power factor correction. If only a single motor or a small number of motors require power factor correction, the capacitor can be installed at each motor such that it is switched on and off with the motor.

Required Precaution for selecting Capacitor for Motor:

The care should be taken in deciding the Kvar rating of the capacitor in relation to the magnetizing kVA of the machine.
If the rating is too high, It may damage to both motor and capacitor.
As the motor, while still in rotation after disconnection from the supply, it may act as a generator by self excitation and produce a voltage higher than the supply voltage. If the motor is switched on again before the speed has fallen to about 80% of the normal running speed, the high voltage will be superimposed on the supply circuits and there may be a risk of damaging other types of equipment.
As a general rule the correct size of capacitor for individual correction of a motor should have akvar rating not exceeding 85% of the normal No Load magnetizing KVA of the machine. If several motors connected to a single bus and require power factor correction, install the capacitor(s) at the bus.

Where do not install Capacitor on Motor:

Do not install capacitors directly onto a motor circuit under the following conditions:
  1. If solid-state starters are used.
  2. If open-transition starting is used.
  3. If the motor is subject to repetitive switching, jogging, inching, or plugging.
  4. If a multi-speed motor is used.
  5. If a reversing motor is used.
  6. If a high-inertia load is connected to the motor.
Fixed power capacitor banks can be installed in a non-harmonic producing electrical system at the feeder, load or service entrance. Since power capacitor banks are reactive power generators, the most logical place to install them is directly at the load where the reactive power is consumed.
Three options exist for installing a power capacitor bank at the motor.
Installing a power capacitor bank at the motor
Installing a power capacitor bank at the motor

Location 1 (The line side of the starter)

Install between the upstream circuit breaker and the contactor.
This location should be used for the motor loads with high inertia, where disconnecting the motor with the power capacitor bank can turn the motor into a self excited generator, motors that are jogged, plugged or reversed, motors that start frequently, multi-speed motors, starters that disconnect and reconnect capacitor units during cycling and starters with open transition.

Advantage

Larger, more cost effective capacitor banks can be installed as they supply kvar to several motors. This is recommended for jogging motors, multispeed motors and reversing applications.

Disadvantages

  • Since capacitors are not switched with the motors, overcorrection can occur if all motors are not running.
  • Since reactive current must be carried a greater distance, there are higher line losses and larger voltage drops.

Applications

  • Large banks of fixed kVAR with fusing on each phase.
  • Automatically switched banks

Location 2 (Between the overload relay and the starter)

Install between the contactor and the overload relay.
  • This location can be used in existing installations when the overload ratings surpass the National Electrical Code requirements.
  • With this option the overload relay can be set for nameplate full load current of motor. Otherwise the same as Option 1.
  • No extra switch or fuses required.
  • Contactor serves as capacitor disconnect.
  • Change overload relays to compensate for reduced motor current.
  • Too much Kvar can damage motors.
Calculate new (reduced) motor current. Set overload relays for this new motor FLA.
FLA (New) = P.F (Old) / P.F (New) x FLA (Name Plate)

Application:

Usually the best location for individual capacitors.

Location 3 (The motor side of the overload relay)

Install directly at the single speed induction motor terminals (on the secondary of the overload relay).
  • This location can be used in existing installations when no overload change is required and in new installations in which the overloads can be sized in accordance with reduced current draw.
  • When correcting the power factor for an entire facility, fixed power capacitor banks are usually installed on feeder circuits or at the service entrance.
  • Fixed power capacitor banks should only be used when the facility’s load is fairly constant. When a power capacitor bank is connected to a feeder or service entrance a circuit breaker or a fused disconnect switch must be provided.
  • New motor installations in which overloads can be sized in accordance with reduced current draw
  • Existing motors when no overload change is required.

Advantage

  • Can be switched on or off with the motors, eliminating the need for separate switching devices or over current protection. Also, only energized when the motor is running.
  • Since Kvar is located where it is required, line losses and voltage drops are minimized; while system capacity is maximized.

Disadvantages

  • Installation costs are higher when a large number of individual motors need correction.
  • Overload relay settings must be changed to account for lower motor current draw.

Application

Usually the best location for individual capacitors.

Placement of capacitors in Distribution system

The location of low voltage capacitors in Distribution System effect on the mode of compensation, which may be global (one location for the entire installation), by sectors(section-by-section), at load level, or some combination of the last two.
In principle, the ideal compensation is applied at a point of consumption and at the level required at any instant.
Placement of capacitors in distribution system
Placement of capacitors in distribution system


A. Global compensation

Principle

The capacitor bank is connected to the bus bars of the main LV distribution board to compensation of reactive energy of whole installation and it remains in service during the period of normal load.

Advantages

  • Reduces the tariff penalties for excessive consumption of kvars.
  • Reduces the apparent power kVA demand, on which standing charges are usually based
  • Relieves Reactive energy of Transformer , which is then able to accept more load if necessary

Limitation

  • Reactive current still flows in all conductors of cables leaving (i.e. downstream of) the main LV distribution board. For this reason, the sizing of these cables and power losses in them are not improved by the global mode of compensation.
  • The losses in the cables (I2R) are not reduced.

Application

  • Where a load is continuous and stable, global compensation can be applied
  • No billing of reactive energy.
  • This is the most economical solution, as all the power is concentrated at one point and the expansion coefficient makes it possible to optimize the capacitor banks
  • Makes less demands on the transformer.

B. Compensation by sector

Principle

Capacitor banks are connected to bus bars of each local distribution Panel.
Most part of the installation System can benefits from this arrangement, mostly the feeder cables from the main distribution Panel to each of the local distribution panel.

Advantages

  • Reduces the tariff penalties for excessive consumption of kvar.
  • Reduces the apparent power Kva demand, on which standing charges are usually based.
  • The size of the cables supplying the local distribution boards may be reduced, or will have additional capacity for possible load increases.
  • Losses in the same cables will be reduced.
  • No billing of reactive energy.
  • Makes less demands on the supply Feeders and reduces the heat losses in these Feeders.
  • Incorporates the expansion of each sector.
  • Makes less demands on the transformer.
  • Remains economical

Limitations

  • Reactive current still flows in all cables downstream of the local distribution Boards.
  • For the above reason, the sizing of these cables, and the power losses in them, are not improved by compensation by sector
  • Where large changes in loads occur, there is always a risk of overcompensation and consequent overvoltage problems.

Application

Compensation by sector is recommended when the installation is extensive, and where the load/time patterns differ from one part of the installation to another.
This configuration is convenient for a very widespread factory Area, with workshops having different load factors

C. Individual compensation

Principle

  • Capacitors are connected directly to the terminals of inductive circuit (Near to motors). Individual compensation should be considered when the power of the motor is significant with respect to the declared power requirement (kVA) of the installation.
  • The kvar rating of the capacitor bank is in the order of 25% of the kW rating of the motor.
  • Complementary compensation at the origin of the installation (transformer) may also be beneficial.
  • Directly at the Load terminals Ex. Motors, a Steady load gives maximum benefit to Users.
  • The capacitor bank is connected right at the inductive load terminals (especially large motors). This configuration is well adapted when the load power is significant compared to the subscribed power. This is the technical ideal configuration, as the reactive energy is produced exactly where it is needed, and adjusted to the demand.

Advantages

  • Reduces the tariff penalties for excessive consumption of kvars
  • Reduces the apparent power kVA demand
  • Reduces the size of all cables as well as the cable losses.
  • No billing of reactive energy
  • From a technical point of view this is the ideal solution, as the reactive energy is produced at the point where it is consumed. Heat losses (RI2) are therefore reduced in all the lines.
  • Makes less demands on the transformer.

Limitations

  • Significant reactive currents no longer exist in the installation.
  • Not recommended for Electronics Drives.
  • Most costly solution due to the high number of installations.
  • The fact that the expansion coefficient is not incorporated.

Application

Individual compensation should be considered when the power of motor is significant with respect to power of the installation.

Common Capacitor Reactive Power Ratings

VoltageKvar RatingNumber of Phases
2165, 7.5, 131/3, 20, 251 or 3
2402.5, 5, 7.5,10, 25, 20, 25, 501 or 3
4805, 10, 15, 20 25, 35, 50, 60, 1001 or 3
6005, 10, 15, 20 25, 35, 50, 60, 1001 or 3
2,40050, 100, 150, 2001
2,77050, 100, 150, 2001
7,20050, 100, 150, 200,300,4001
12,47050, 100, 150, 200,300,4001
13,80050, 100, 150, 200,300,400


for your philippine electrical concerns...needs...installation...orders...safeelectrical2013@gmail.com

METRO MANILA PHILIPPINES



WIRE AND CABLE SUPPLIER IN METRO MANILA
WIRE AND CABLE SUPPLIER IN QUEZON CITY

ELECTRICAL WIRE AND CABLE SUPPLIER IN MAKATI PHILIPPINES
ELECTRICAL WIRE AND CABLE SUPPLIER IN TAGUIG PHILIPPINES

ELECTRICAL WIRE AND CABLE SUPPLIER IN MAKATI PHILIPPINES
ELECTRICAL WIRE AND CABLE SUPPLIER IN GLOBAL CITY PHILIPPINES

ELECTRICAL WIRE AND CABLE SUPPLIER IN MAKATI PHILIPPINES
ELECTRICAL WIRE AND CABLE SUPPLIER IN TAGUIG PHILIPPINES

ELECTRICAL WIRE AND CABLE SUPPLIER IN ALABANG PHILIPPINES
ELECTRICAL WIRE AND CABLE SUPPLIER IN GLOBAL CITY PHILIPPINES

WIRE AND CABLE SUPPLIER IN LUZON
WIRE AND CABLE SUPPLIER IN VISAYA

WIRE AND CABLE SUPPLIER IN SUBIC
WIRE AND CABLE SUPPLIER IN CLARK

WIRE AND CABLE SUPPLIER IN THE PHILIPPINES
WIRE AND CABLE SUPPLIER IN THE PHILIPPINES

ELECTRICAL SUPPLIER IN METRO MANILA
ELECTRICAL SUPPLIER IN QUEZON CITY

ELECTRICAL SUPPLIER IN LUZON
ELECTRICAL SUPPLIER IN VISAYA

ELECTRICAL SUPPLIER IN SUBIC
ELECTRICAL SUPPLIER IN CLARK

ELECTRICAL SUPPLIER IN PHILIPPINE INDUSTRIAL PARK
ELECTRICAL SUPPLIER IN PHILIPPINE ECONOMIC ZONE

ELECTRICAL SUPPLIER FOR PHILIPPINE FOREIGNERS
ELECTRICAL SUPPLIER FOR PHILIPPINE PROVINCES

ELECTRICAL SUPPLIER IN PHILIPPINES BATANES
ELECTRICAL SUPPLIER IN PHILIPPINES LAOAG

ELECTRICAL SUPPLIER IN PHILIPPINES CLARK
ELECTRICAL SUPPLIER IN PHILIPPINES SUBIC

ELECTRICAL SUPPLIER IN PHILIPPINES MANILA
ELECTRICAL SUPPLIER IN PHILIPPINES BATANGAS

ELECTRICAL SUPPLIER IN PHILIPPINES LEGASPI
ELECTRICAL SUPPLIER IN PHILIPPINES BORACAY


ELECTRICAL SUPPLIER IN PHILIPPINES PALAWAN
ELECTRICAL SUPPLIER IN PHILIPPINES PUERTO PRINCESA


ELECTRICAL SUPPLIER IN PHILIPPINES ILOILO
ELECTRICAL SUPPLIER IN PHILIPPINES BICOL

ELECTRICAL SUPPLIER IN PHILIPPINES CEBU
ELECTRICAL SUPPLIER IN PHILIPPINES BOHOL

ELECTRICAL SUPPLIER IN PHILIPPINES SURIGAO
ELECTRICAL SUPPLIER IN PHILIPPINES DUMAGUETE

ELECTRICAL SUPPLIER IN PHILIPPINES BACOLOD
ELECTRICAL SUPPLIER IN PHILIPPINES CAGAYAN DE ORO

ELECTRICAL SUPPLIER IN PHILIPPINES SURIGAO
ELECTRICAL SUPPLIER IN PHILIPPINES BUKIDNON

ELECTRICAL SUPPLIER IN PHILIPPINES ILIGAN
ELECTRICAL SUPPLIER IN PHILIPPINES ZAMBOANGA

ELECTRICAL SUPPLIER IN PHILIPPINES BUTUAN
ELECTRICAL SUPPLIER IN PHILIPPINES GENERAL SANTOS

ELECTRICAL SUPPLIER IN PHILIPPINES ZAMBOANGA
ELECTRICAL SUPPLIER IN PHILIPPINES DAVAO

ELECTRICAL SUPPLIER IN PHILIPPINES CAGAYAN DE ORO
ELECTRICAL SUPPLIER IN PHILIPPINES CAGAYAN DE ORO

ELECTRICAL SUPPLIER IN PHILIPPINES BINONDO
ELECTRICAL SUPPLIER IN PHILIPPINES BINONDO


ELECTRICAL SUPPLIER IN MAKATI PHILIPPINES 
ELECTRICAL SUPPLIER IN MAKATI PHILIPPINES 


ELECTRICAL SUPPLIER IN TAGUIG PHILIPPINES 
ELECTRICAL SUPPLIER IN TAGUIG PHILIPPINES


ELECTRICAL SUPPLIER IN METRO MANILA PHILIPPINES
ELECTRICAL SUPPLIER IN METRO MANILA PHILIPPINES


ELECTRICAL SUPPLIER IN MANILA PHILIPPINES
ELECTRICAL SUPPLIER IN MANILA PHILIPPINES

ELECTRICAL SUPPLIER IN NOVALICHES QUEZON CITY PHILIPPINES
ELECTRICAL SUPPLIER IN NOVALICHES QUEZON CITY PHILIPPINES


ELECTRICAL SUPPLIER IN SAN JOSE DEL MONTE BULACAN PHILIPPINES
ELECTRICAL SUPPLIER IN SAN JOSE DEL MONTE BULACAN PHILIPPINES


FOR YOUR PHILIPPINE ELECTRICAL CONCERNS...NEEDS...INSTALLATION...QUOTATION...ORDERS
KINDLY EMAIL US: SAFEELECTRICAL2013@GMAIL.COM
                 SAFEELECTRICALONLINE@GMAIL.COM

FOR YOUR PHILIPPINE ELECTRICAL CONCERNS...NEEDS...INSTALLATION...QUOTATION...ORDERS:
KINDLY EMAIL US: SAFEELECTRICAL2013@GMAIL.COM
                 SAFEELECTRICALONLINE@GMAIL.COM

FOR PHILIPPINE INQUIRIES LIKE LIGHTNING ARRESTER SUPPLY AND INSTALLATION
CONTACT US:  

FOR PHILIPPINE INQUIRIES LIKE LIGHTNING ARRESTER SUPPLY AND INSTALLATION
CONTACT US: 

FOR PHILIPPINE INQUIRIES LIKE LIGHTNING ARRESTER SUPPLY AND INSTALLATION
CONTACT US: 

MOBILE NUMBERS: SMART: +63 09079522099 
                       +63 09214026477
  
                GLOBE: +63 09273919600
                       +63 09157920129

                SUN:   +63 9227192434
                       +63 09336253505

                WIRELESS LANDLINE:   +63 4068727
                                     +63 4922566
                
                LANDLINE:    +63 4317553



HURRY..CALL US...NOW!!!!
THANK YOU FOR YOUR ORDERS AND INQUIRIES...



LIGHTNING ARRESTER SUPPLIER AND INSTALLER IN THE PHILIPPINES
ELECTRICAL FENCE SUPPLIER AND INSTALLER IN THE PHILIPPINES


LIGHTNING ARRESTER SUPPLIER AND INSTALLER IN METRO MANILA
ELECTRICAL FENCE SUPPLIER AND INSTALLER IN METRO MANILA

LIGHTNING ARRESTER SUPPLIER AND INSTALLER IN THE PHILIPPINE ECONOMIC ZONE
ELECTRICAL FENCE SUPPLIER AND INSTALLER IN THE PHILIPPINE ECONOMIC ZONE

LIGHTNING ARRESTER SUPPLIER AND INSTALLER IN THE VISAYA REGION
ELECTRICAL FENCE SUPPLIER AND INSTALLER IN THE VISAYAS REGION

LIGHTNING ARRESTER SUPPLIER AND INSTALLER IN THE MINDANAO
ELECTRICAL FENCE SUPPLIER AND INSTALLER IN THE MINDANAO


FOR YOUR LIGHTNING STRIKE PROTECTION...LET US HELP YOU AVOID SUCH ACCIDENTS...
BEFORE IT IS TOO LATE...BEFORE IT IS TOO LATE...

WHEN LIGHTNING STRIKE HIT YOU..
I GUARANTEE YOU..YOU'LL NEVER LIVE TO TELL YOUR EXPERIENCE...

DON'T BE THE NEXT VICTIM...PROTECT YOURSELF..YOUR FAMILY..YOUR BUSINESS AT ALL TIMES..
INSTALL A LIGHTNING ARRESTER IN YOUR PLACE...DO IT NOW BEFORE YOUR CAUGHT UNAWARE...

IF YOU HAVE LIGHTING PROTECTION INSTALLED...
YOU'LL HAVE PEACE OF MIND...YOU CAN SLEEP WELL EVEN WHEN LIGHTNING STRIKES...

YOU KNOW YOUR WELL PROTECTED...
IN YOUR HOME, IN YOUR PLACE OF BUSINESS AND IN YOUR PROPERTIES...

HURRY..CALL US...NOW!!!!
THANK YOU FOR YOUR ADVANCE ORDERS AND INQUIRIES...


"PHILIPPINE FOREIGNERS AND PHILIPPINE PROVINCES ELECTRICAL SUPPLIER
 AND SERVICE PROVIDER"

"SAFE ELECTRICAL SUPPLY AND SERVICES"
"SAFE ELECTRICAL SUPPLY AND SERVICES"

"SAFE ELECTRICAL SUPPLY AND SERVICES"
"SAFE ELECTRICAL SUPPLY AND SERVICES"



Jigz Enerio - Sales/Project Coordinator
Safe Electrical Supply and Services

Registered Master Electrician PRC#00034433
Real Estate Broker PRC#0000838
Institute of Integrated Electrical Engineers(IIEE)Membership#19420

Telephone:  4068727  4922566
Telefax:    4178583  4317553
smart:      09079522099
globe:      09273919600
sun:        09227192434

Building K-415 Smilecitihomes 1 Barangay Kaligayahan 
Novaliches Quezon City 1124

YAHOO MESSENGER: SAFEELECTRICALSUPPLYANDSERVICES@YAHOO.COM
                 SAFEELECTRICALSUPPLYANDSERVICES

WEBSITE:        WWW.SAFEELECTRICALSUPPLYANDSERVICES.BLOGSPOT.COM
WEBSITE:        WWW.SAFEELECTRICALSUPPLYANDSERVICES.BLOGSPOT.COM

WEBSITE:        WWW.SAFEELECTRICALSUPPLYANDSERVICES.BLOGSPOT.COM
WEBSITE:        WWW.SAFEELECTRICALSUPPLYANDSERVICES.BLOGSPOT.COM   

"The Elevator to Success is always out of order,
        but one can always use the stairs"
"One does not Lead by hitting people over the Head,
        that's assault not Leadership"  - Eisenhower
"If You Think Education is Expensive,
        count the cost of being ignorant" - Past Harvard President
"If you're gonna be thinking anyway,
        you might as well think big"    - Donald Trump
"Insanity, doing the same things 
        over and over again,
        then expecting a different result"   - Albert Einstein
"Small minds talk of people, 
        average minds talk of events,
               great minds talk of ideas"
“I shall pass this way but once; any good that I can do 
        or any kindness I can show to any human being;   
        let me do it now. Let me not defer nor neglect it,
        for I shall not pass this way again.”

              Etienne de Grellet  (1773-1855);
              Quaker missionary

If you wanna make the world a better place
take a look at yourself and make a change  
                  - Michael Jackson

"The Best things in life are FREE,
        Family, Relatives, Friends, Health and most especially Time"


Our company operates in the principle of cooperation, collaboration, 
joint partnership/marketing and cross promotion.

We treat our people,clients,suppliers,affiliates
subcontractors, business owners, entrepreneurs(SMALL TIME or Bigtime),

common people,sales people especially PURCHASING OFFICERS as our business partners and friends.
We operate in the principle of Win-Win in every transactions we get involved in 

and our company would like to establish good long-term relationship with the client we serve...
We value and aim for REPEAT BUSINESS...and not just for a one-time transaction...


Delivery Schedule:  9am to 10pm Monday to Friday Only

OFFICE DAYS:  Monday to Friday Only
              9-12PM TO 1-5PM ONLY
              
              Saturday: Lord's day "EL SHADDAI" The God who is more than enough
              Sunday:   Family day

10% of what the company earns, we give to the Lord,
10% of what the company earns, we give to charity,
this is the company's way of giving back part of what it earns,
to the community and above.            



"It is unwise to pay too much, but it's worst to pay too little.
    When you pay too much, you lose a little money - that is all...
 When you pay too little, You sometimes lose everything,
    Because the thing you bought or the service you acquired
      was incapable of doing the thing it was bought or intended to do.
 The common law of business balance 
    prohibits paying a little and getting a lot - it can't be done.
       If you deal with the lowest bidder,
          It is well to add something for the risk you run,
             And if you do that, 
                You will have enough to pay for something better." 

                       - JOHN RUSKIN(1819 - 1900)

"Good things aren't cheap,
                 and cheap things aren't good"


HEALTH TIPS  HEALTH TIPS  HEALTH TIPS  HEALTH TIPS  HEALTH TIPS  HEALTH TIPS

ATTENTION:         FOR ALL INDIVIDUALS ESPECIALLY THOSE AGE 40 AND ABOVE.


MEDICAL EXPERIMENT - MIRACLES WITH WATER

Japanese Sickness Association has published the following experiment with WATER.

They Claim 100% success for curing old and new diseases as follows:

1. Headache, BP, Anaemia, Arthrosis, Paralysis, Palpitation, Epilepsy and Obesity

2. Cough, Bronchitis, Asthma, and Tuberculosis

3. Meningitis and any other diseases connected with URINE and LIVER.

4. Hyper-acidity, Gastritis, Dysentery, Constipation, Piles and Diabetes

5. Any other diseases connected with Eye, Nose and Throat.

6. Irregular menstrual periods of women



METHOD OF TREATMENT AND MAINTENANCE:

1. Wake-up early morning and drink Four(4) glasses (160ml each) in an empty stomach. 

    Thereafter, no solids or liquids should be taken up to 45 minutes.

2. Normal breakfast can be taken after the 45 minutes time elapsed.

3. Nothing either liquid or solid should be taken  for Two(2) hours after breakfast, the same as with Lunch and Dinner.

4. After Dinner nothing should be taken before bedtime or sleep.

Sick and old people will find it difficult to drink Four(4) glasses of water at an  instant in the beginning, but, can increase

gradually to the recommended level in a short time period.

Experiment has proved that the following diseases have been cured on treatment of water for the period shown against them

a) Hypertension - 30 days                  d) Constipation  - 10 days

b) Gastric Problems - 30 days           e) Cancer - 6 months

c) Diabetes  - 30 days                         f) Tuberculosis  - 3 months

Those who suffering from Arthritis should try this experiment three(3) times a day for one(1) week and thereafter reduce to 

once in the morning. For first few days you may experience to pass urine more than the norma, but no side effects.



THIS WILL CLEANSED YOUR BODY OF IMPURITIES AND WILL

PREVENT MANY TYPES OF DISEASES...



EXERCISE RELIGIOUSLY...

AS THE SAYING GOES "HEALTH IS WEALTH"



REMEMBER:

70% of our body is made up of water...
only 30% of our body is solid...


HEALTH  IS WEALTH...
WHAT'S THE USE OF HAVING A BILLION 
                                             BUT LYING IN A BED - SICK
                                                                    OR SUFFERING FROM AN ILLNESS.....

I WOULD RATHER HAVE A CLEAN BILL OF HEALTH FOR A BILLION.

WHEN YOU REACH THE AGE OF 35 EXERCISE IS A MUST...
WATCH YOUR DIET...

EXERCISE DAILY AND RELIGIOUSLY
TAKE YOUR MULTIVITAMINS TO SUPPLEMENT YOUR FOOD INTAKE....

THE BEST THINGS IN LIFE ARE FREE.....
           FAMILY....RELATIVES....FRIENDS....HEALTH and most importantly TIME....

YOU ARE MORE BLESSED THAN OTHERS...

WHEN YOU HAVE BOTH YOUR EYES SO YOU CAN CLEARLY SEE
        OTHERS HAVE ONLY ONE...OTHERS ARE TOTALLY BLIND...
WHEN YOU HAVE BOTH YOUR EARS SO YOU CAN CLEARLY HEAR
       OTHERS HAVE ONLY ONE...OTHERS ARE TOTALLY DEAF...
WHEN YOU HAVE BOTH YOUR HANDS SO YOU CAN HOLD THINGS WELL
       OTHERS HAVE ONLY ONE...OTHERS HAVE NONE...
WHEN YOU HAVE BOTH YOUR FEET SO YOU CAN WALK EASILY
       OTHERS HAVE ONE...OTHERS HAVE NONE..
WHEN YOU STILL HAVE YOUR PARENTS...
       OTHERS HAVE ONE...OTHERS HAVE NONE...
WHEN YOU HAVE CHILDREN...
      OTHERS HAVE ONE...OTHERS HAVE NONE...
WHEN YOU HAVE A FAMILY...
      SOME HAVE NONE...OTHERS TOTALLY ORPHANED
WHEN YOU ARE LIVING IN THE PHILIPPINES...A DEMOCRATIC COUNTRY..
      THE WEATHER NOT THAT EXTREMELY HOT NOR COLD..
       WERE PLANTS AND TREES GROW EASILY
       SURROUNDED BY SEAS FULL OF FISHES AND NATURAL RESOURCES
WHEN YOU ARE OLD AND STILL LIVING WITH YOUR CHILDREN
       IN SOME COUNTRIES OLD PARENTS AND PEOPLE 
            ARE LEFT IN THE "HOME OF THE AGED NURSING FOUNDATION"
WHEN YOU STILL HAVE YOUR JOB...WORKING IN AN AIR-CONDITIONED  
        ROOM..JUST CONSIDER THE CONSTRUCTION WORKERS DOING THEIR
        HARD LABOR JOBS UNDER THE HEAT OF THE SUN...IGNORING THE
        DANGEROUS ELEMENTS CONFRONTING THEM....

COUNT YOUR BLESSINGS...COUNT THEM ONE BY ONE...

DON'T THINK OF SAYING ANY UNKIND WORD...
      THINK OF PEOPLE WHO CAN'T SPEAK,
DON'T COMPLAIN ABOUT THE FOOD YOU EAT,
      SOME HAVE NOTHING.
DON'T COMPLAIN ABOUT LIFE,
      PAINT A SMILE ON YOUR FACE
AND THANK GOD YOU'RE ALIVE AND STILL AROUND

LIFE IS A GIFT......
LIVE IT WELL......

SAFETY 1ST
               REPEAT BUSINESS 2ND

PRAY ALWAYS IT WORKS!!!            

ATTENTION:  FOREIGN ELECTRICAL MANUFACTURERS AND ELECTRICAL DISTRIBUTORS

OUR COMPANY WELCOMES ELECTRICAL FOREIGN SUPPLIER/MANUFACTURER/S
WHO WOULD LIKE TO OFFER THEIR PRODUCT LINE
HERE IN THE PHILIPPINES BUT ON A CONSIGNMENT BASIS ONLY,

MEANING PAYMENT WILL BE FOR A CERTAIN PERIOD...EXAMPLE SIX(6) MONTHS TO ONE(1) YEAR,
ALL THOSE ITEMS THAT WILL NOT BE SOLD OR SLOW MOVING ITEMS WILL BE REPLACED

AND WE WILL JUST PAY FOR THOSE SOLD ITEMS


YOUR COMPANY WILL BE SHOULDERING THE FORWARDING/FREIGHT COST
OR SHIPMENT COST...

WE WILL BE IN CHARGE OF STOCKAGE,MARKETING,SALES AND AFTER SALES CONCERNS..
CONTACT,EMAIL OR CALL US IF YOUR COMPANY IS INTERESTED WITH OUR OFFER...

BY THE WAY PAYMENT WILL BE BANK TO BANK...
YOUR BANK WILL BE COORDINATING WITH OUR LOCAL BANK HERE IN THE PHILIPPINES....

CALL/EMAIL US IF YOUR COMPANY IS INTERESTED ON OUR OFFER....

No comments: